PROJECT/LOCATION :
UNACCOUNTED - FOR WATER STUDIES “UFW”, GILAN, BUSHEHR & KISH WATER AND WASTE WATER Co. - IRAN
SCOPE OF WORKS : ENGINEERING SERVICES (PHYSICAL & NON PHYSICAL LOSSES CALCULATED/ADDRESSED)
PROJECT DETAIL :
PHYSICAL & NON PHYSICAL LOSSES :
- DEFECTIVE METERS
- METER’S ERROR
- OPEN SEAL
- ILLEGAL'S
- BROKEN PIPES & CONNECTIONS
- DEFECTIVE VALVES
- OVER FLOW
- HYDRANTS