6 | JEY OIL REFINERY | OIL REFINERY PLANT | CONCEPTUAL DESIGN/FEASIBILITY STUDY | MARCH2021 - JUN 2021 |
7 | BUSHEHR PETROCHEMICAL COMPANY (JAHAN PARS CO) | UTILITY AND OFF-SITE | BASIC ENGINEERING AND FEED DOCUMENT | JAN 2020 – MAR 2020 |
8 | SHAHID TONDGOOYAN PETROCHEMICAL COMPANY | SSP PLAN FEASIBILITY STUDY | FEASIBILITY STUDY | JAN 2018 - MAY 2018 |
9 | PIROOZI OIL & GAS COMPANY | F&G AND FIREFIGHTING SYSTEM DESIGN | BASIC AND DETAIL ENGINEERING AND PROCUREMENT SERVICES | JAN 2018 - JAN 2019 |
10 | MOKRAN TERMINAL AND TANKS COMPANY | BASIC ENGINEERING OF BUFFER TANKS AND METHANOL TRANSMISSION PIPELINE | BASIC AND FEED ENGINEERING | SEP 2017 - FEB 2018 |
11 | SIRAF GREEN STAR REFINERY | GAS CONDENSATE REFINERY PLANT | MANAGING CONTRACTOR | MAR 2020 – JAN 2020 |
12 | RAHYAR GOSTAR NOVIN COMPANY | MINI REFINERY PROJECT | BASIC DESIGN | JAN 2022– MAR 2023 |
13 | ASSALOUYEH GREEN TANK FARM PETROCHEMICAL COMPANY(AGTP) | TANK FARM | ENGINEERING AND CONSULTING | AUG 2020 – DEC 2023 |
14 | QESHM OIL INVESTMENT COMPANY | OIL TANK TERMINAL | BASIC ENGINEERING,MANAGING CONTRACTOR AND TECHNICAL ASSISTANCE | NOV 2019 – JUN 2024 |
15 | SIRAF ENERGY INVESTMENT CO. | METHANOL PLANT (5000 MTPD) | MANAGING CONTRACTOR / SITE SUPERVISION | Oct 2010 - Apr 2018 |
16 | NATIONAL IRANIAN GAS Co. | FIRE WATER AND DEMAND WATER SYSTEM | DETAIL ENGINEERING | Aug 2016 - Apr 2017 |
17 | KERMAN PETROCHEMICAL COMPLEX CO. | KERMAN GTPP PETROCHEMICAL PLANT (Phase 1) | FEASIBILITY STUDY, MANAGEMENT CONSULTANCY | Aug 2016 - Feb 2017 |
18 | DOMINION VENTURES CO. ( Oman ) | BITUMEN PLANT (STORAGE TANKS) | BASIC & DETAIL DESIGN, PROCUREMENT, CONSTRUCTION, COMMISSIONING AND START UP (EPCC) | Jul 2015 - Jul 2016 |
19 | NATIONAL IRANIAN SOUTH OIL CO. (NISOC) | REVAMPING OF TURBO COMPRESSORS CS-600 & CS-700 | ENGINEERING & PROCUREMENT (EP) | Oct 2010 - March 2013 |
20 | PASARGAD Oil Co. | BITUMEN STORAGE TANKS IN BANDAR-E-IMAM | BASIC & DETAIL DESIGN / SITE SUPERVISION | Feb 2010 - Jun 2013 |
21 | BOU ALI SINA PETROCHEMICAL CO. | LIGHT END HYDROTREATMENT UNIT | MANAGING CONTRACTOR | Mar 2010 - Apr 2012 |
22 | RESEARCH & TECHNOLOGY PETROCHEMICAL CO. (ARAK CENTER) | FREON PLANT | ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) | May 2008 - May 2009 |
23 | RESEARCH & TECHNOLOGY PETROCHEMICAL CO. (ARAK CENTER) | HYDROGEN PEROXIDE PLANT | ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) | May 2008 - May 2009 |
24 | RESEARCH & TECHNOLOGY PETROCHEMICAL CO. (ARAK CENTER) | HYDRAZIN HYDRATE PLANT | ENGINEERING, PROCUREMENT & CONSTRUCTION (EPC) | May 2008 - May 2009 |
25 | MOBIN PETROCHEMICAL CO. | EXTENTION PROJECTS | SITTING ANALYSIS AND PLANT ASSEMENT, ENGINEERING / INSPECTION | Jan 2008 - Jul 2009 |
26 | BANDAR IMAM PETROCHEMICAL CO. (BIPC) | ETHANE/PROPANE RECOVERY PLANT | MANAGING CONTRACTOR / SITE SUPERVISION | Jan 2003 - Jun 2006 |
27 | BANDAR IMAM PETROCHEMICAL CO. (BIPC) | EXPANSION OF OLEFIN PLANT | MANAGING CONTRACTOR | Mar 2008 - Mar 2008 |
28 | RANGIN KAMAN CO. | CHEMICAL PLANT DESIGN / UTILITY / OFFSITE | BASIC & DETAIL DESIGN | Mar 2008 - Mar 2010 |
29 | IRANOL OIL CO. | OIL STORAGE TANKS AND RELATED ACCESSORIES | BASIC & DETAIL DESIGN | Dec 2007 - Feb-2008 |
30 | FAJR 2 PETROCHEMICAL CO. | UTILITY/OFFSITE | DETAIL DESIGN / SITE SUPERVISION | Jan 2008 - Jan 2009 |
31 | AZARAB INDUSTRIES CO. | AS SUWAYDA COMBINED CYCLE POWER PLANT IN SYRIA | TECHNICAL & COMMERCIAL FEASIBILITY STUDY | Sep 2006 - Sep 2007 |
32 | BOU ALI SINA PETROCHEMICAL CO. | DECOKING SYSTEM | BASIC & DETAIL DESIGN | Nov 2008 - Feb 2008 |
33 | RESEARCH & TECHNOLOGY PETROCHEMICAL CO. (ARAK CENTER) | UTILITY/OFFSITE | BASIC ENGINEERING | Dec 2008 - Nov 2009 |
34 | GRAET TEHRAN GAS CO. (GTGC) | DOMESTIC GAS SUPPLY AND DISTRIBUTION | SITE SUPERVISION | Sep 2006 - Sep 2009 |
35 | TEHRAN PROVINCE GAS CO. (TPGC) | DOMESTIC GAS SUPPLY AND DISTRIBUTION | BASIC & DETAIL DESIGN | Sep 2006 - May 2007 |
36 | ARAK GAS CO. (AGC) | DOMESTIC GAS SUPPLY AND DISTRIBUTION | SITE SUPERVISION | Sep 2006 - Sep 2007 |
37 | KERMAN GAS CO.(KGC) | CONSTRUCTION OF GAS PIPE LINE 20 (INCH_GOLGOHAR) | SITE SUPERVISION | Dec 2006 - Dec 2008 |
38 | KERMAN GAS CO.(KGC) | DOMESTIC GAS SUPPLY AND DISTRIBUTION | SITE SUPERVISION | Dec 2006 - Dec 2009 |
39 | BANDAR IMAM PETROCHEMICAL CO. (BIPC) | STYRENE MONOMER STORAGE TANKS,LOADING AND UNLOADING FACILITIES | BASIC & DETAIL DESIGN | Oct 2004 - Dec 2004 |
40 | RAZI PETROCHEMICAL CO. (RPC) | AMAK GAS TREATMENT | BASIC & DETAIL DESIGN | May 2004 - Dec 2007 |
41 | RAZI PETROCHEMICAL CO. (RPC) | REHABILITATION/REVAMPING OF UREA NO. 2 PLANT (PHASE 2) | MANAGING CONTRACTOR / SITE SUPERVISION | Sep 2003 - Dec 2006 |
42 | GHAED BASIR PETROCHEMICAL CO. | UTILITY/OFFSITE | DETAIL DESIGN / SITE SUPERVISION | Feb 2002 - Mar 2004 |
43 | RAZI PETROCHEMICAL CO. (RPC) | INTERCONNECTION BETWEEN RPC UREA PLANT NO. 2 AND UREA GRANULATION PLANT | MANAGING CONTRACTOR / SITE SUPERVISION | Mar 2002 - Nov 2002 |
44 | RAZI PETROCHEMICAL CO. (RPC) | NEW AMMONIA PLANT (NO. 3) | ECONOMICAL, TECHNICAL & COMMERCIAL FEASIBILITY STUDY | Jun 2000 - Oct 2000 |
45 | RAZI PETROCHEMICAL CO. (RPC) | REHABILITATION OF PHOSPHORIC ACID PLANT | MANAGING CONTRACTOR / ASSESSMENT THE PLANT & PREPARE DOCOMENT FOR REVAMPING | Jan 2001 - Jan 2002 |
46 | TABRIZ PETROCHEMICAL CO. | LINE (E) OFFSITE FACILITIES | BASIC & DETAIL DESIGN / SITE SUPERVISION | Jun 1999 - Jul 2002 |
47 | MASHALDARAN PETROCHEMICAL CO. | LINEAR ALKYLE BENZENE PLANT | SITING ANALYSIS AND SITE SELECTION | Oct 1998 - Jan 1999 |
48 | SHIRAZ PETROCHEMICAL CO. | RENOVATION AND REVAMPING OF CHOLRINE ALKALINE UNIT | ENGINEERING SERVICES FOR PARTIAL DETAIL DESIGN | Aug 1995 - Oct 1996 |
49 | GARMSAR WATER SUPPLY CO. | PIPE LINE CLEANING DESIGN FROM ALOAK TO GARMSAR (77 KM) | DESIGN, CALCULATION AND PREPARING PROCEDURE FOR MECHANICAL AND CHEMICAL CLEANING | Aug 1994 - Oct 1994 |
50 | KISH WATER AND POWER CO. | UNACCOUNTED-FOR WATER "UFW" STUDIES | ENGINEERING SERVICES TO REDUCE WATER LOSS | Sep 1996 - Sep 1997 |
51 | BUSHER WATER AND WASTEWATER CO. | UNACCOUNTED-FOR WATER "UFW" STUDIES | ENGINEERING SERVICES TO REDUCE WATER LOSS | Apr 1995 - Nov 1999 |
52 | NEGIN PRODUCTION CO. | REFRIGERATOR PRODUCTION DEVELOPMENT | TECHNICAL AND COMMERCIAL FEASIBILITY STUDY | Aug 2005 - Oct 2005 |
53 | HORMOZGAN WATER & WASTEWATER CO. | WATER DISTRIBUTION SYSTEM | UNACCOUNTED FOR WATER(UFW) STUDY TO REDUCE WATER LOSS | Jan2000 - Jan 2001 |
54 | GUILAN WATER & WASTEWATER CO. | WATER DISTRIBUTION SYSTEM | UNACCOUNTED FOR WATER(UFW) STUDY TO REDUCE WATER LOSS | Apr 1999 - Sep 2000 |
55 | KISH WATER & POWER Co. | RENOVATION AND DEVELOPMENT OF WATER DISTRIBUTION SYSTEM | BASIC & DETAIL DESIGN | Sep 1999 - Feb 2000 |