PROJECT/LOCATION :
STYRENE MONOMER STORAGE TANKS, LOADING AND UNLOADING, BANDAR IMAM PETROCHEMICAL Co., BANDAR-E-IMAM-IRAN
PROJECT DETAIL :
ENGINEERING SERVICES FOR STORAGE TANKS WITH EACH CAPACITY OF 2500 TON, LOADING AND UNLOADING SYSTEM, RELATED PUMPS, REFRIGERATION PACKAGE AND TBC INJECTION PACKAGE
SCOPE OF WORKS :
ENGINEERING SERVICES CONSISTS OF :
- CONCEPTUAL DESIGN
- BASIC ENGINEERING
- DETAIL ENGINEERING