REHABILITATION / REVAMPING OF UREA PLANT No. 2

PROJECT/LOCATION : REHABILITATION / REVAMPING OF UREA PLANT NO. 2 , RAZI PETROCHEMICAL Co. (RPC), MAHSHAHR - IRAN

PROJECT DETAIL :
MODERNIZATION OF UREA PLANT AIMED AT ENERGY SAVING AND TO ENHANCE PLANT CAPACITY FROM 1500 MTPD TO 1850 MTPD. THE MAJOR CHANGES INCLUDE
- REPLACEMENT OF CO2 COMPRESSOR & TURBINE
- REPLACEMENT OF AMMONIA PUMPS
- REPLACEMENT OF CARBONATE PUMPS
- REPLACEMENT OF UREA MELT PUMP
- REPLACEMENT OF PRE EVAPORATOR
- UPGRADING COOLING TOWER
- MODIFICATION OF REACTOR & DESORPTION COLUMN TRAYS, BLOWERS & CONDENSERS


SCOPE OF WORKS :


(I) SITE SURVEY/SITTING ANALYSIS AND REVAMPING :

- SITE SURVEY AND SITTING ANALYSIS

- REFURBISHMENT AND REVAMPING ASSESSMENT

- TECHNICAL-ECONOMIC FEASIBILITY STUDY

- TENDER DOCUMENT PREPARATION

- AS BUILT DOCUMENTATION/DRAWING

- BID SPECIFICATION

- BID EVALUATION

- BID EVALUATION

(II) PROJECT MANAGEMENT CONSULTANCY SERVICES :

- TECHNOLOGY EVALUATION

- SELECTION OF CONTRACTORS

- REVIEW / APPROVAL OF BASIC ENGINEERING

- REVIEW /APPROVAL OF DETAIL ENGINEERING

- ENSURING CONFORMITY OF EQUIPMENT SUPPLIED TO APPROVED SPECIFICATIONS

- CHECK & REVIEW OF VENDOR DRAWINGS

- EXPEDITING

- SCHEDULING, MONITORING & COST CONTROL

- SUPERVISION OF CONSTRUCTION, ERECTION, PRE-COMMISSIONING & COMMISSIONING

-STATUTORY CLEARANCES / APPROVALS